Often the bathroom is one of the most overlooked rooms in the home when it comes to decorating. We tend to see it as a utilitarian spac...
Before going ahead to remodel your bathroom, it is necessary for you to ask and answer the following questions:
How much money do yo...
Laying ceramic tiles is simple if you have the right guidance. If laying ceramic tiles is totally new to you, '5 Steps to complete a su...
December 3rd, 2008 at 7:26 am
in reality it should have been grouted first how bout if the bathroom floor becomes flooded?so that guys dead wrong make him grout first!
December 3rd, 2008 at 11:43 pm
Yes, you do. ;o)
December 7th, 2008 at 3:38 am
You need to allow the floor to expand and contract at a different rate than the walls. Do not fill the voids. Put a shoe moulding over the ends of the tiles near the walls.
December 8th, 2008 at 9:43 am
I would want the grout to fill all voids to prevent moisture from getting in.
December 9th, 2008 at 11:02 pm
the shoe molding will be grouted or glued in place….when they get to it…
December 11th, 2008 at 8:39 pm
When doing tile the base should have been put on after tile. So since you want a floor that is water tight I would caulk the base to the floor even if he wants to put shoe in.
December 12th, 2008 at 8:15 am
We grout, it is necessary because if moisture gets in there it can creep up the walls and cause problems.
December 12th, 2008 at 11:01 pm
A bead of silicone caulk should have been placed between the tile and the wall, then the baseboard put on. The idea is that since this is a bathroom the potential for water spills is very high. You don’t want the water escaping and getting under the wood studs and framing.
He took the easy way out.
December 13th, 2008 at 12:03 am
They missed a step….Use a good clear silicone caulking in the ‘crack’ where tile and grout meet wall. Otherwise, if for example, someone showers and gets water on the floor, it will get into this area, go under the tile and start to ruin the flooring under the tile. Mold and mildew can also grow in these wet areas. Molding trim only covers the edge of the tile giving it a neater more finished appearance, but it’s still cosmetic…to protect, you need to seal or caulk around the outer edges of your flooring. You will also need to use a sealant on the grout between your new tiles as well, or the same problem can occur, as grout is porous and can absorb water and soapy liquids which then go down into the underflooring, and different liquids can stain the grout.
December 14th, 2008 at 3:35 pm
The tile should have been put down before the base board to have been done properly. Often times in your case, the tile is done this way. You can put a small piece of trim on the base board. I would use the trim used for corners and paint to match.
December 18th, 2008 at 2:04 am
The other contractors are right. First you lay down the tile, then you normally put on the shoe molding. You don’t want to fill in the gap between the wall and the tile, there has to be room between the two to allow for expansion. Also I believe there is sheeting that can be laid down over wood flooring to prevent the water from leaking down and ruining the wood of the floor. For tile showers, they put a metal pan under the tile that prevents the water from ruining the wood underneath. The metal pan runs to the drain.
Here’s a good website on how to tile properly.
,,221776,00.html